My First Participate in English Mosaic
The English Mosaic was held on The 1th of december, 2006. i was a staff. i was not qualified staff. Actually, i was a volunteer. i did some work. i carried the box and water pot-it was very big and heavy-. i also did OHP installment. OHP is the machine which showing the data through reflect light. In fact, i did not succeeded to the installment. Because i have not been touched yet.
It was so small thing what i have to do. So after Mosaic was starting i was just audience. whenever represent finished i did claped very hard. During the mosaic the occurence of a small accident. it was a mechanical problem. everyone never expect that. For example, shut down the computer or mic was out of order. But Nevertheless these some happening, The Englich Mosaic was so succeeded and pleased event.